2.5 Pre-observation Checklist
Ready to observe? Check that all the following tasks have been done:
- Determined sources to use for:
- setup calibrator
- primary flux calibrator
- bandpass calibrator
- phase calibrator(s)
- pointing calibrator(s) (only if doing reference pointing)
- polarisation calibrator(s) (only if doing polarisation studies)
- Checked that all sources are visible during observing time.
- Prepared a schedule file using the CABB web scheduler for:
- array setup
- calibration
- program observations
- Used the sensitivity calculator to make sure that integration time on
calibrators is sufficient.
- Ensured that turret movements are limited to once every 15 minutes or
longer.
- Generated a mosaic pointing file (only if doing mosaic observations),
and copied it to the appropriate place on XBONES.
- Generated an ephemeris for the solar system object (only if doing
solar system observations), and copied it to the appropriate place on XBONES.
- Calculated how much data the observations will generate, and obtained
enough disk space to accommodate this.
- Checked for possible problems, and made contingency plans for:
- Antenna shadowing
- Wrong time range for flux calibrator observations
- Bad weather forecast during observations
- Check current issues page http://www.narrabri.atnf.csiro.au/observing/CurrentIssues.html
for issues that may cause problems with the observations.
- Checked that remote observations are possible (only if remotely observing).
- Contacted observatory staff and duty astronomer if assistance will be
required during observations.
<?xml version=”1.0” encoding=”UTF-8”?>
<!DOCTYPE plist PUBLIC “-//Apple//DTD PLIST 1.0//EN” “http://www.apple.com/DTDs/PropertyList-1.0.dtd”>
<plist version=”1.0”>
<array>
<string>/var/folders/MZ/MZYPyDHjEiqf+CvJhAyk5k+-70k/-Tmp-/com.apple.mail.drag-T0xf10430.tmp.RE9Djq/Cab_6400.pdf</string>
</array>
</plist>